780-699-1694
Plan the dirt, pick the iron

How much dirt, and what moves it?

Measure your cut and fill, compare every machine class for the work, and build an equipment and fuel plan you can export as a PDF for a bid or an approval. When it looks right, send it to MCS for a quote.

Move Compact Plan
$per litre Used for the fuel cost in every calculator and in the plan.

Dirt calculator

Cut and fill in metres. Results in bank, loose and compacted cubic metres.

AreaTypeLength (m)Width (m)Depth / height (m)

Each area is a rectangle with straight sides. Split an odd-shaped site into a few rectangles.

With a customer login

What customers could do once they sign in

Saved projects

Keep each job's dirt numbers and equipment setup, and come back to them.

One-click quote

Send a saved setup straight into the quote builder, machines and hours filled in.

Rentals on site

See which MCS machines are on each job, start dates and service history.

Paperwork

Quotes, rental agreements and invoices in one place.

Estimates only. Bucket sizes, cycle times, truck payloads and material factors are typical figures for each class, not guarantees for a specific machine, operator or site. Production assumes a level, well-maintained haul road and a loading area that lets trucks spot without delay. Confirm with an MCS rep before planning a job around these numbers.